What's required to install an indoor video board?
Most indoor installs need three things: a structure rated to carry the display (wall, beam, or ceiling mount), electrical service to the board, and a data and control connection to your operating position. Nevco provides the mounting and load specs and coordinates with your facilities team or contractor, so the building is ready on install day. Your dedicated Nevco Project Manager leads the project from start to finish—walking you through every step and keeping all the moving pieces on track through installation.